SJSSAA Kapar - Instrument recalibration for Unit 6 Boiler & Turbine  

Saftech was awarded a sub-contracting work from Instrutech Engineering to recalibrate instrument for SJSSAA Power Station Phase III Unit 6 Overhaul Inspection. This contract is the continuation of the contract that was awarded earlier for Unit No. 5 warranty inspection. Works for Unit No. 6 have started from November 2002 and schedule to be completed around January 2003. Scope of works includes Pressure and Temperature Transmitter, Switches and gauges. The area covered is for equipment installed in Turbine contract, Boiler Contract and Ash Handling Plant Phase 3.

 

 