TNBG Serdang - Flowmeter Installation Progress Work.

Saftech start the installation Rosemount-Fisher Ultrasonic Flow meter for TNBG Serdang Power Station on the 26 January 2003 after the "Permit-to-Work" was issued. Gas free test was conducted after all the LNG valves was isolated. Flange piping and existing flowmeter was dismantled for modification at workshop as precautionary measure to adjacent running plant.

Instrument transmitter and cabling hook-up is expected to be carry after the above modification have been carried out.

Specialist from vendor will carry out the setup and commissioning of the Flowmeter.


 